Sign installation for construction projects

On a construction project, the signs are often one of the last things to go up, right when the schedule is tightest. We help Denver general contractors and developers plan and make the signs for the buildings they deliver. Ask about installation when you request a quote.

What signs a project may need

Building and tenant signs

Lit channel letters such as reverse-lit letters on the facade or tenant spaces.

Wall and door signs

Aluminum signs for addresses, entrances and service doors.

Glass and interior

Window graphics and wall graphics for lobbies and storefronts.

Who handles what on the project

On a commercial job, sign work touches several trades. The framer or mason adds backing. The electrician runs power to the sign location. The sign maker builds and mounts the sign. Sorting out who does what at the start saves a lot of calls later.

Put the sign scope in writing: who provides the backing, who provides the circuit, who pulls the sign permit and who makes the final hookup. Then share it with the owner, the tenant if there is one, and the trades.

Plan it before the walls close

The best time to plan a sign is during the build, not after. Lit signs need power close to the sign, and heavy signs need solid backing behind the wall. Both are easy to add before the finish goes on and costly to add later. Share the elevation drawings early so the sign location, power and backing can be planned with the trades.

On multi-tenant projects, the owner’s sign criteria often set letter height, color and lighting. Ask for it early, since tenants will follow it too.

Site conditions we look at

  • Mounting surface: brick, stucco, metal panel, EIFS or glass each take different hardware.
  • Access: ladder, lift, scaffolding or sidewalk closure.
  • Power: a circuit near the sign for lit letters.
  • Schedule: when the wall, power and site access will be ready.

Photos, drawings and rough sizes are a good start. Our post on construction site signs covers the signs needed during the build.

Permits and approvals

Most permanent exterior signs need a city sign permit, and lit signs often need an electrical permit. Electrical hookups are usually done by a licensed electrician. Rules vary by city, so check early. Our sign permit guides explain what to expect, and our designers can prepare sign drawings with the sizes a permit usually asks for. Owner and landlord approval should be in hand before fabrication starts.

How it fits your schedule

  1. Share drawings and dates. Elevations, sign criteria and the project schedule.
  2. Quote the whole job. Design, production and the installation plan in one quote.
  3. Approve the proof. Nothing is made until you say yes.
  4. Permits and power. The sign goes up once approvals and power are ready.
  5. Install. Lead time depends on the job, so call early to set dates.

What affects the price

Installation is quoted per job. Sign size and weight, the wall, the height and equipment needed, lighting and the number of pieces all play a part. For your budget, ask that each sign quote spells out who supplies the lift, who makes the electrical connection and who hauls away the packaging, so nothing falls between trades. Other materials, like adhesive vinyl or coroplast, are simpler and quicker to put up. For more, see our main sign installation page.

Related: channel letters for construction and storefront signs. More for construction project managers and on our construction printing page.

Questions

When should a GC bring in the sign company?

During the build, before walls are finished, so power and backing can be planned for lit and heavy signs.

Do installed signs need a permit?

Most permanent exterior signs need a city sign permit, and lit signs often need an electrical permit. Check with the city early.

Can you install signs the owner already bought?

Possibly. Send the sign maker’s drawings or the sign’s size, weight and mounting method, plus photos of the wall, and we’ll let you know.

What do you need to quote installation?

Elevation drawings or photos, sign sizes, the wall surface, access details and your schedule.

Who provides backing and power for a new sign?

Usually the framing or masonry trade adds backing and the electrician brings power to the sign location. Agree on this in writing early.

How much does sign installation cost?

It is quoted per job. Sign size and weight, the wall, height, equipment, lighting and number of pieces affect the price.

Get the signs on schedule

Send the elevations and your dates. We’ll quote the whole job and plan the install with you.

Call (720) 903-3522