Sign permits in Greeley: what the development code says

Greeley’s sign rules are in Chapter 17 of the City of Greeley’s Development Code. Here’s a plain summary of what the code says about permits, exempt signs, temporary signs and sandwich boards.

Signs that need a permit

Greeley’s code says all signs require a permit unless they’re specifically exempt. It lists awning, canopy, electronic message, freestanding and monument, projecting and wall signs as needing a sign permit. Replacing, repairing or majorly changing a sign needs a new permit.

Planning staff review the sign, and then the city’s building official issues the permit. Electrical permits for lit signs are issued separately through the building inspection division. Fees are set in Chapter 22 of the Development Code.

Signs that don’t need a permit

As long as they meet the code, these signs need no permit:

  • Copy changes on legally conforming signs, and changeable copy.
  • Window signs covering up to 25% of the glass.
  • One portable sign per storefront (see below).
  • Yard and site signs, construction site signs, flags, holiday decorations and directional signs on the property.
  • Wind-driven devices such as pennants, feather flags and sky dancers, within the code’s limits.
  • Signs inside buildings, vehicle signs and incidental signs.

Window graphics printed on 3M IJ35C vinyl and kept under 25% of the glass skip the permit.

Temporary signs

Greeley requires a temporary sign permit for temporary signs. The code sets these limits for commercial and industrial uses:

  • Up to 60 days total per calendar year.
  • Total temporary signage of up to 33 square feet in the R-H and C-L zones, or 50 square feet in other commercial and industrial zones.
  • Signs tied to a temporary use can last as long as the use, up to 90 days a year, with a possible 30 day extension.
  • Balloons and inflatables with text or graphics, up to 33 square feet, count as temporary signs and need a permit.

A 3 by 10 foot 13oz vinyl banner is 30 square feet, which fits under both size caps.

Sandwich boards

One portable sign, such as a sandwich board, is allowed per storefront without a permit if it’s within 20 feet of the main public entrance, no larger than 6 square feet per face and 48 inches tall, out only during business hours, and not blocking sight lines or traffic. If any part sits in the right-of-way, you need a right-of-way revocable sign permit. An aluminum sandwich board can be built to those limits.

Historic signs

A sign that the city’s historic preservation commission has designated as a historic landmark may be kept and displayed under the code’s rules. When the city reviews sign variances, it also considers historic value as set by the commission.

What to submit

  1. A completed sign permit application signed by the property owner, tenant or licensed sign contractor, with the address, valuation and zoning district.
  2. A scaled sign elevation with dimensions, lighting and materials, and structural details.
  3. A site plan with streets and property lines, plus an inventory of existing signs.
  4. Building elevations for wall signs, or a site layout with setbacks and height for freestanding signs.

Greeley takes building permit applications and plans through eTRAKiT. We didn’t find a dedicated sign page on the city’s website, so ask Community Development how to submit a sign permit and what it costs.

Getting your Greeley sign made

Our in-house designers can prepare the scaled elevation with dimensions and materials, and you approve a proof before anything prints. Every job is quoted. See our printing for Greeley businesses or the other sign permit guides.

Official sources

This page summarizes the city’s published guidance and isn’t legal advice. Rules change, so confirm with the city before you install.

Questions

Do I need a permit for a business sign in Greeley?

Usually, yes. Greeley’s code says all signs need a permit unless specifically exempt, including wall, freestanding, monument, projecting, awning and canopy signs.

How long can a temporary sign stay up in Greeley?

Temporary signs for commercial and industrial uses can be displayed up to 60 days total per calendar year, with a temporary sign permit.

Do I need a permit for a sandwich board in Greeley?

No, for one per storefront within 20 feet of the main entrance, up to 6 square feet per face and 48 inches tall, during business hours. Right-of-way placement needs a revocable permit.

Do window signs need a permit in Greeley?

No, if they cover no more than 25% of the glass.

Who issues sign permits in Greeley?

The building official issues sign permits after planning staff approve them. Electrical permits are issued separately.

Planning a new sign?

Tell us your Greeley address and what you need. We’ll design it, send a proof and quote the job.

Call (720) 903-3522